Repository logo
 
Publication

Construção do Parque Eólico Rymanów (Polónia)

dc.contributor.advisorJacob, Ângelo Manuel Gonçalves
dc.contributor.authorSilva, Márcia Filipa Teixeira da
dc.date.accessioned2015-05-27T15:51:21Z
dc.date.available2016-10-01T00:30:12Z
dc.date.issued2013
dc.description.abstractO presente relatório tem como principal objetivo caracterizar os trabalhos desenvolvidos e estudados ao longo do estágio realizado na Martifer Renewables S.A., empresa de Engenharia na vertente das energias renováveis. O estágio incidiu na construção do parque eólico Rymanów, tendo-se desenvolvido no local da obra onde se acompanhou o processo de construção, bem como nos escritórios da empresa em Cracóvia onde se obteve informação relevante sobre o projeto. Este trabalho começa por abordar a energia eólica no seu contexto histórico, onde são referidas as suas vantagens e desvantagens e é analisado o seu processo evolutivo. Faz uma referência às razões que levam uma empresa a construir um parque eólico na Polónia, e demonstra os tipos de investidores existentes neste mercado. Posteriormente é descrito o estudo de viabilidade do projeto, isto é, os parâmetros essenciais desenvolvidos na fase inicial do projeto, assim como a fase de lançamento de concursos para a sua construção. De seguida, é abordado o processo de construção do parque eólico, onde o acompanhamento da obra foi imprescindível. É apresentado o procedimento de operações e manutenção do parque eólico e é feita uma análise sobre o tipo de financiamento da obra de construção. Por fim, é realizada uma abordagem acerca da internacionalização das empresas portuguesas, como é o caso da empresa atrás referida. É apresentada uma curiosidade relativamente às construções na Polónia, tal como algumas novas experiências culturais que a estagiária teve a oportunidade de viver. No final do trabalho, são tiradas conclusões e sugeridos desenvolvimentos.por
dc.description.abstractThis report aims to characterize the work developed and studied throughout the internship held on Marifer Renewables S.A., an engineering company devoted to the renewable energies. This internship focused on the construction of Rymanów’s wind farm, it was developed on the construction site where the building process was followed, as well as in the offices of the company in Krakow where it was obtained important information about the project. This work begins by approaching wind energy in its historical context, which refers the advantages and disadvantages and its evolutionary process. It makes a reference to the reasons that lead a company to build a wind farm in Poland and demonstrates the types of existing investors in this market. Later it is described the viability study of the project, in other words, the essential parameters developed in the early stage of the project, as well as the stage of tendering for its construction. Then we approach the process of wind farm construction, where the monitoring of the work was essential. It’s presented the procedure of operations and maintenance of the wind farm and an analysis is made about the type of financing construction work. Finally, an approach is made about the internationalization of Portuguese companies, such as the referred company. It’s also shown some curiosities concerning the buildings of Poland, such as some new culture experiences that the intern had the opportunity to live. At the end of the paper, conclusions are drawn and developments are suggested.por
dc.identifier.tid201746603
dc.identifier.urihttp://hdl.handle.net/10400.22/6141
dc.language.isoporpor
dc.subjectEnergia eólicapor
dc.subjectParque eólicopor
dc.subjectConstruçãopor
dc.subjectWind energypor
dc.subjectWind farmpor
dc.subjectConstructionpor
dc.titleConstrução do Parque Eólico Rymanów (Polónia)por
dc.typemaster thesis
dspace.entity.typePublication
rcaap.rightsopenAccesspor
rcaap.typemasterThesispor
thesis.degree.levelMestradopor
thesis.degree.nameMestrado de Engenharia Civil –Ramo de Construçõespor

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
DM_MarciaSilva_2013_MEC.pdf
Size:
31.51 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: