Publication
Integração de resultados de ensaios de controlo de qualidade de materiais em odelos BIM
datacite.subject.fos | Engenharia e Tecnologia | pt_PT |
dc.contributor.advisor | Oliveira, Maria Do Rosário Santos | |
dc.contributor.author | Rocha, Patrícia Maria Barbosa da | |
dc.date.accessioned | 2024-10-31T16:06:00Z | |
dc.date.available | 2024-10-31T16:06:00Z | |
dc.date.issued | 2024-09-27 | |
dc.description.abstract | O presente relatório visa descrever o trabalho realizado durante o estágio curricular que teve lugar na SENQUAL, uma empresa que presta serviços de consultoria e controlo de qualidade no âmbito da Indústria da Construção Civil e Obras Públicas, com atividade no mercado de trabalho há mais de 25 anos. Numa economia cada vez mais competitiva e numa sociedade cada vez mais exigente a todos os níveis, torna-se indispensável o cumprimento de uma boa gestão em qualquer organização, incluindo-se o tratamento eficiente da informação, que é nos dias de hoje, um aspeto crucial a considerar, dada a acumulação da quantidade e variedade de tipos de ficheiros que surgem e, muitas vezes, se tendem a perder. Por meio a atender às necessidades que vão surgindo e ao acompanhamento da evolução que se faz sentir, a empresa encontra-se num estado de progresso tecnológico, visando automatizar o máximo possível os diferentes processos para a realização dos ensaios, através de um software interno que tem vindo a desenvolver, juntando os conceitos de digitalização e inovação. Considerando esse software, procedeu-se ao estudo de uma futura inclusão de dashboards interativas que apresentem os resultados dos diferentes ensaios realizados no laboratório, abrangendo modelos 3D (quando já existentes) que proporcionam a perceção da localização das amostras usadas para os mesmos. Esta função foi possível recorrendo a programas como o Power Bi, Revit e 3DBI, e tem como propósito oferecer aos clientes uma forma inovadora, mais apelativa e sintetizada de consultar os seus resultados pretendidos. Em 2017 parte do tema foi estudado e desenvolvido por um aluno ex-estagiário, incidindo na integração dos resultados dos ensaios no modelo 3D em Revit, para um caso de estudo específico. O presente projeto estendeu-se à criação de dashboards, e ao estudo da integração dos modelos 3D nas mesmas. Este trabalho teve a colaboração de outro aluno, com o intuito de o mesmo dar continuidade na sua futura dissertação, a par do desenvolvimento do software mencionado anteriormente. | pt_PT |
dc.description.abstract | The purpose of this report is to describe the work carried out during the internship that took place at SENQUAL, a company that provides consulting and quality control services in the Construction and Public Works Industry, which has been active in the labour market for over 25 years. In an increasingly competitive economy and in a society that is increasingly demanding at all levels, it is essential to comply with a good management in any organization, including the efficient treatment of information, which is nowadays a crucial aspect to consider, given the accumulation of the quantity and the variety of types of files that appear and often tend to get lost. To meet the needs that arise and to keep up with the evolution that is felt, the company is in a state of technological progress, aiming to automate as much as possible in the different processes for carrying out the tests, through an internal software that it has been developing, combining the concepts of digitalization and innovation. Considering this software, it was proposed to study the future inclusion of interactive dashboards that show the results of the different tests carried out in the laboratory, including 3D models that provide the perception of the location of the samples used for them. This function was made possible using programs such as Power Bi, Revit and 3DBI, and aims to offer customers an innovative, more appealing and synthesized way of consulting their desired results. In 2017, part of the theme was studied and developed by a former intern student, focusing on the integration of the test results in Revit for a specific case study. This project extended the previous creation of dashboards and the study of a more generic integration of results, to adapt to any test/work, to be included in them. This work had the collaboration of another student, with the aim of continuing his future dissertation, along with the development of the software mentioned above. | pt_PT |
dc.identifier.tid | 203713729 | pt_PT |
dc.identifier.uri | http://hdl.handle.net/10400.22/26322 | |
dc.language.iso | por | pt_PT |
dc.subject | Digitalization | pt_PT |
dc.subject | Dashboards | pt_PT |
dc.subject | Power Bi | pt_PT |
dc.subject | BIM | pt_PT |
dc.subject | Revit | pt_PT |
dc.subject | 3DBI | pt_PT |
dc.subject | Digitalização | pt_PT |
dc.title | Integração de resultados de ensaios de controlo de qualidade de materiais em odelos BIM | pt_PT |
dc.title.alternative | Integration of quality control test results of materials into BIM models | pt_PT |
dc.type | master thesis | |
dspace.entity.type | Publication | |
rcaap.rights | openAccess | pt_PT |
rcaap.type | masterThesis | pt_PT |
thesis.degree.name | Mestrado em Engenharia Civil | pt_PT |