Repository logo
 
Publication

Estudo de Tempos e Métodos de Produção na Área da Montagem da Produção

datacite.subject.fosSistemas e Planeamento Industrialpt_PT
dc.contributor.advisorRodrigues, José Alberto Madureira Salgado
dc.contributor.authorCosta, Fábio Filipe Fernandes da
dc.date.accessioned2018-01-24T15:29:16Z
dc.date.available2019-11-20T01:30:16Z
dc.date.issued2016
dc.description.abstractA realização deste projeto tem como objetivo o estudo de tempos e métodos de produção na área da montagem da produção do modelo P13 da McLaren e ML da MFTE (Mitsubishi Fuso Truck Europe’s) numa empresa multinacional ligada ao ramo automóvel, tendo como objetivo o aumento da eficiência do processo produtivo. Inicialmente o trabalho incidiu na confrontação do esquema da cablagem do modelo com o routing report de modo a verificar se existiam operações inseridas no esquema que não estavam contempladas no routing report e a sua identificação (estudo de operações). Ainda inserido no estudo de operações, também foram analisados e descritos os processos realizados na montagem da cablagem (estudo real) de modo a ser possível confrontar os processos “teóricos” e os processos “reais”. Posteriormente, foi realizado o estudo de tempos recorrendo ao método de cronometragem, tendo sido monitorizadas várias operações de que já se sabia a priori que o tempo de operação não estava em concordância com a realidade. Também foram realizadas cronometragens por posto de trabalho. Por fim, e atendendo ao trabalho realizado, os dados obtidos foram enviados para o departamento Custeio e para as chefes de linha de produção em estudo. Tendo em conta os objetivos do trabalho achou-se oportuno proceder à realização do balanceamento de linha de cablagens (simples e complexas) que começarão a ser produzidas em 2017. Em suma e em resultado do estudo efetuado, constatou-se que no caso do modelo P13 existe uma diferença de cerca de 5% dos processos comparando os processos realizados na linha de montagem e os processos descritos no Routing Report. Relativamente ao modelo ML, a mesma comparação regista uma diferença de 4,8%.pt_PT
dc.description.abstractThe realization of this project aims to control times and production processes in the assembly area of the McLaren P13 and ML of MFTE (Mitsubishi Fuso Truck Europe's) models in a multinational company related to the automotive sector, with the objective of increasing efficiency of the production process. Initially the work focused in the confrontation of the model wiring scheme with the routing report in order to verify and identify if there were operations included in the scheme that were not included in the routing report (study of operations). Still inserted in the study of operations, the processes performed in wiring assembling (real study) analyzed and described so that it will be to confront the "theoretical" with the “real” processes. Subsequently, the time study was performed using the timing method and by monitoring various operations from which it was already known that the operation time was not in accordance with reality. Time measurements for each work station were also carried out. Finally, and taking into account the work done, the studied data were sent to the costing department and to the heads of the tested production line. Taking into account the objectives of the study, it was found to be appropriate to implement the line balancing (simple and complex), which production will start in 2017. In short, and as a result of the performed study, it was found that in the case of P13 model there is a difference of about 5% of processes by comparing the processes performed on the assembly line and the ones described in the Routing Report. For the ML model, the same comparison registers a difference of 4.8%.pt_PT
dc.identifier.tid201749688pt_PT
dc.identifier.urihttp://hdl.handle.net/10400.22/10852
dc.language.isoporpt_PT
dc.subjectControlo de tempos e métodospt_PT
dc.subjectEficiênciapt_PT
dc.subjectBalanceamento de linhaspt_PT
dc.subjectCronometragempt_PT
dc.subjectControl times and methodspt_PT
dc.subjectEfficiencypt_PT
dc.subjectLine balancingpt_PT
dc.subjectTimingpt_PT
dc.titleEstudo de Tempos e Métodos de Produção na Área da Montagem da Produçãopt_PT
dc.typemaster thesis
dspace.entity.typePublication
rcaap.rightsopenAccesspt_PT
rcaap.typemasterThesispt_PT
thesis.degree.nameMestrado em Engenharia Eletrotécnica e de Computadorespt_PT

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
DM_FabioCosta_2016_MEEC.pdf
Size:
5.98 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: