Repository logo
 
Loading...
Thumbnail Image
Publication

Optimal Contract Power and Battery Energy Storage System Capacity for Smart Buildings

Use this identifier to reference this record.
Name:Description:Size:Format: 
ART_GECAD_Zhara_Optimal Contract Power_2021.pdf682.3 KBAdobe PDF Download
license.txt1.74 KBLicense Download

Advisor(s)

Abstract(s)

This paper proposed a Mixed Binary Linear Programming (MBLP) approach to find the optimal size of some components of a Smart Building (SB) attempting to reduce the overall cost. The considered SB is equipped with local resources such as Photovoltaic (PV) panels, Electrical Vehicles (EVs), and the Battery Energy Storage System (BESS). Moreover, the SB is only connected with the grid by an Energy Management System (EMS) in which the whole SB has a single Contract Power (CP) such that EMS manages the power flow among external grid, local resources, apartments, and common services, for the goal of reducing the electricity bill. Hence, the wrong choice of CP and BESS capacity will impose unnecessary charges on the electricity bill. As a results, EMS has played a crucial role in SB in determining the best CP and BESS values. The obtained results of this work show the efficiency of the model in which by finding the optimal capacity of CP and BESS, the electricity bill improves by a 34% reduction

Description

Keywords

Energy Management System Mixed Binary Linear Programming Optimal value of Contract Power Optimal Size of BESS Renewable Energy Smart Building

Citation

Organizational Units

Journal Issue