Repository logo
 
Publication

Quality assurance of welded construction of industrial boilers

dc.contributor.authorPereira, A. B.
dc.contributor.authorMartinho, J. C. F.
dc.contributor.authorSilva, F. J. G.
dc.date.accessioned2021-06-14T09:22:13Z
dc.date.embargo2100
dc.date.issued2021
dc.description.abstractQuality assurance is an essential and indispensable requirement in metalworking. The obligation of manufacturers to comply with this requirement depends on the framework and scope applicable to the product. Thus, the manufacturer must not only know and respect the current legislation and regulations, but also the extensive standardization applicable to the products. Specially, manufacturers whose product is based on welded construction and subject to CE marking, have the obligation to know and implement all the necessary provisions for the conformity of the product from its conception to the availability of the product on the market. In this case, the objective of this work is to describe, specify and solve the various steps that allow a manufacturer of steam boilers to guarantee the quality in the welded construction of their product, with all that this implies. Nowadays the manufacturer's problem is not the quantity and capacity of the physical resources of manufacture, but rather the mastery of the technique and actuality of specific knowledge required to ensure the product compliance. A methodology to approach construction is proposed, assuming the manufacturer role, from the framing of the product to inspection and final testing. It is intended to detail and technically fully document each step, in accordance with the legislation and building codes applicable to the boiler under study.pt_PT
dc.description.versioninfo:eu-repo/semantics/publishedVersionpt_PT
dc.identifier.isbn978-1-53619-685-6
dc.identifier.urihttp://hdl.handle.net/10400.22/18042
dc.language.isoengpt_PT
dc.publisherNova Science Publisherspt_PT
dc.relation.publisherversionhttps://novapublishers.com/shop/handbook-of-welding-processes-control-and-simulation/pt_PT
dc.subjectUnder Pressure Equipmentpt_PT
dc.subjectBoilerpt_PT
dc.subjectWeldingpt_PT
dc.subjectRequirementspt_PT
dc.subjectSpecificationpt_PT
dc.subjectProcedurept_PT
dc.subjectWelderpt_PT
dc.subjectCE Markingpt_PT
dc.subjectQualitypt_PT
dc.subjectControlpt_PT
dc.titleQuality assurance of welded construction of industrial boilerspt_PT
dc.typebook part
dspace.entity.typePublication
oaire.citation.endPage504pt_PT
oaire.citation.issueCap. 16pt_PT
oaire.citation.startPage465pt_PT
oaire.citation.titleHandbook of Welding: Processes, Control and Simulationpt_PT
person.familyNameSilva
person.givenNameFrancisco
person.identifier1422904
person.identifier.ciencia-idB81C-4758-2D59
person.identifier.orcid0000-0001-8570-4362
person.identifier.ridI-5708-2015
person.identifier.scopus-author-id56870827300
rcaap.rightsclosedAccesspt_PT
rcaap.typebookPartpt_PT
relation.isAuthorOfPublicationd050c135-4d9d-4fb2-97d1-cac97be3f6b9
relation.isAuthorOfPublication.latestForDiscoveryd050c135-4d9d-4fb2-97d1-cac97be3f6b9

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
CAPL16_FGS_DEM_2021.pdf
Size:
4.48 MB
Format:
Adobe Portable Document Format