Repository logo
 
Publication

Balanceamento e implementação de linha de montagem de equipamento para transporte pré-hospitalar

datacite.subject.fosGestão Industrialpt_PT
dc.contributor.advisorSilva, Francisco José Gomes da
dc.contributor.authorCorreia, Vasco José Mota
dc.date.accessioned2019-07-04T09:31:22Z
dc.date.available2021-11-20T01:30:24Z
dc.date.issued2018
dc.description.abstractA presente dissertação incide sobre o balanceamento da linha de montagem de equipamento de transporte pré-hospitalar e implementação de Standard Work nos diversos postos de trabalho, com o objetivo de conseguir um aumento de produção. Aplicou-se a filosofia Lean e diversas ferramentas relacionadas com a melhoria contínua. A eliminação de desperdícios e o aumento da eficiência dos recursos produtivos, contribuirão para a melhoria do desempenho e da competitividade da AR Equipment. Com a implementação das melhorias na linha de montagem e no respetivo bordo de linha, será possível reduzir o número de tarefas, permitindo o equilíbrio da carga horária entre os operadores e a otimização do processo produtivo. Foi elaborado um estudo dos tempos e métodos nos vários processos de montagem, e nos respetivos postos de trabalho, para cada família de produtos. Posteriormente, foi realizada uma comparação dos dados com base no estado inicial da empresa e nos resultados obtidos neste projeto. Analisaram-se as mudanças implementadas e o impacto que as mesmas tiveram em todo o processo produtivo.pt_PT
dc.description.abstractThis dissertation intends to improve the balancing of the assembly line of prehospital transport equipment and the implementation of Standard Work in various workstations with the goal of get an increase of production. It was applied Lean philosophy and several tools related to continuous improvement. Elimination of waste and the increase efficiency of productive resources will contribute to improve the performance and competitiveness of AR Equipment. With the implementation of the improvements in the assembly line and its respective board of line, it will be possible to reduce the number of tasks, allowing the balance of the workload between the operators and the optimization of the production process. A study of the times and methods was elaborated in the various assembly processes and the respective workstations for each family of products. Subsequently, a comparison of the data was made based on the initial state of the company and results obtained in this project. It was analyzed the changes implemented and their impact in the whole production process.pt_PT
dc.identifier.tid202167160pt_PT
dc.identifier.urihttp://hdl.handle.net/10400.22/14245
dc.language.isoporpt_PT
dc.subjectLeanpt_PT
dc.subjectBalanceamentopt_PT
dc.subjectKaizenpt_PT
dc.subjectStandard Workpt_PT
dc.subjectKanbanpt_PT
dc.subjectBalancingpt_PT
dc.titleBalanceamento e implementação de linha de montagem de equipamento para transporte pré-hospitalarpt_PT
dc.typemaster thesis
dspace.entity.typePublication
rcaap.rightsopenAccesspt_PT
rcaap.typemasterThesispt_PT
thesis.degree.nameMestrado em Engenharia Mecânicapt_PT

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
DM_VascoCorreia_2018_MEM.pdf
Size:
9.97 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: