Repository logo
 
Publication

Aplicação de Lean Manufacturing no desenho e montagem de transelevadores

dc.contributor.advisorSilva, Francisco José Gomes da
dc.contributor.authorGeraldes, André de Sá Ferreira
dc.date.accessioned2020-04-16T10:09:05Z
dc.date.available2022-11-13T01:30:56Z
dc.date.issued2019
dc.description.abstractNo panorama empresarial atual, cada vez mais é exigido às empresas uma grande eficácia e eficiência, para que possam ser competitivas e manterem-se dessa maneira no Mercado. Para tal, é necessário que todos os métodos de trabalho da empresa se espelhem nestes valores. Neste seguimento, a presente dissertação tem como principal objetivo a melhoria do processo de montagem de um transelevador, equipamento integrante de um armazém automático, através da aplicação de técnicas Lean. Para que o objetivo desta dissertação fosse atingido, iniciou-se a mesma por um enquadramento teórico sobre o equipamento estudado, onde é aplicado e quais as suas funções, abordando o tema da logística, e também fazendo uma introdução às metodologias Lean aplicadas durante o desenvolvimento. Foi de seguida feito um levantamento do processo atual e escolhida qual a técnica que melhor se aplicava à melhoria do processo. Tendo em conta a análise do processo atual através da elaboração de um VSM, e consequente sequência de operações, e com base nos artigos estudados, foi implementada a técnica das Oito formas de desperdício, com o objetivo de identificar os diferentes tipos de desperdício, tendo sido identificados cinco desperdícios. Para uma mais fácil resolução destes desperdícios, estes foram abordados e estudados individualmente, aplicando a cada um deles, outras técnicas Lean (Standardized Work, 5S, SMED, Poka Yoke e Fluxograma), com vista à eliminação dos mesmos. A aplicação destas técnicas traduziu-se numa redução total do tempo de montagem de 44,5 h e 13% em material. Para finalização do estudo, foi realizado um cálculo do payback por máquina, sendo precisas 21 máquinas para recuperar o investimento. Para além dos resultados positivos comprovados, pudemos aferir também, a partir desta dissertação, que as ferramentas Lean são extremamente úteis e poderosas, quando aplicadas da maneira correta.pt_PT
dc.description.abstractIn today's business landscape, companies are increasingly required to be highly effective and efficient so that they can be competitive and stay that way in the marketplace. This requires that all of the company's working methods reflect these values. The main objective of this dissertation is to improve the process of assembling a stacker crane, an equipment that is part of an automatic warehouse, through the application of Lean techniques. In order to achieve the objective of this dissertation, it began by doing a theoretical framework about the equipment studied, where it is applied and what are their functions, addressing the logistics theme and also making an introduction to the lean methodologies applied during the development. A research of the current process was then done and the technique which best fits to process improvement was chosen. Taking into account the analysis of the current process through the elaboration of a VSM, and consequent sequence of operations, and based on the articles studied, the Eight Waste Forms technique was implemented in order to identify the different types of waste, having five wastes identified. For an easier resolution of these wastes, they were approached and studied individually, applying to each of them other Lean techniques (Standardized Work, 5S, SMED, Poka Yoke and Flowchart), in order to their elimination. The application of these techniques resulted in a total assembly time reduction of 44,5 h and a 13% reduction in material. In order to complete this study, a payback calculation per machine was made, concluding that are required 21 machines to recover the investment. In addition to the proven positive results, we can also verify from this dissertation that Lean tools are extremely useful and powerful when correctly applied.pt_PT
dc.identifier.tid202766420
dc.identifier.urihttp://hdl.handle.net/10400.22/15775
dc.language.isoporpt_PT
dc.subjectLogísticapt_PT
dc.subjectTranselevadorespt_PT
dc.subjectAS/RSpt_PT
dc.subjectLeanpt_PT
dc.subjectOito formas de desperdíciopt_PT
dc.subjectVSMpt_PT
dc.subjectStandardized Workpt_PT
dc.subject5Spt_PT
dc.subjectSMEDpt_PT
dc.subjectPoka Yokept_PT
dc.subjectFluxogramapt_PT
dc.subjectBrainstormingpt_PT
dc.subjectPaybackpt_PT
dc.subjectTransportept_PT
dc.subjectMovimentopt_PT
dc.subjectEsperaspt_PT
dc.subjectProcessamento impróprio/defeituosopt_PT
dc.subjectRetrabalho ou defeitopt_PT
dc.subjectLogisticspt_PT
dc.subjectStacker Cranespt_PT
dc.subjectEight Ways of Wastept_PT
dc.subjectFlowchartpt_PT
dc.subjectTransportationpt_PT
dc.subjectInventorypt_PT
dc.subjectMotionpt_PT
dc.subjectWaitingpt_PT
dc.subjectImproper/Defective Processingpt_PT
dc.subjectRework or Defectspt_PT
dc.titleAplicação de Lean Manufacturing no desenho e montagem de transelevadorespt_PT
dc.typemaster thesis
dspace.entity.typePublication
rcaap.rightsopenAccesspt_PT
rcaap.typemasterThesispt_PT
thesis.degree.nameMestrado em Engenharia Mecânica - Gestão Industrialpt_PT

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
DM_AndreGeraldes_2019_MEM.pdf
Size:
7.48 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: