Logo do repositório
 
Miniatura indisponível
Publicação

A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem

Utilize este identificador para referenciar este registo.
Nome:Descrição:Tamanho:Formato: 
ART_JMagalhaesMendes_2011_CIDEM.pdf697.34 KBAdobe PDF Ver/Abrir

Orientador(es)

Resumo(s)

This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.

Descrição

Palavras-chave

Construction management Project scheduling Multi-mode RCPSP Resource constraints Genetic algorithms

Contexto Educativo

Citação

Projetos de investigação

Unidades organizacionais

Fascículo

Editora

University Press

Licença CC

Métricas Alternativas