Name: | Description: | Size: | Format: | |
---|---|---|---|---|
75.9 KB | Adobe PDF |
Advisor(s)
Abstract(s)
In this talk, we discuss a scheduling problem
that originated at TAP - Maintenance & Engineering
- the maintenance, repair and overhaul
organization of Portugal’s leading airline. In the
repair process of aircrafts’ engines, the operations
to be scheduled may be executed on a
certain workstation by any processor of a given
set, and the objective is to minimize the total
weighted tardiness. A mixed integer linear programming
formulation, based on the flexible job
shop scheduling, is presented here, along with
computational experiment on a real instance,
provided by TAP-ME, from a regular working
week. The model was also tested using benchmarking instances available in literature.
Description
Keywords
Real world scheduling Flexible job shop Mixed integer linear programming
Citation
Publisher
University of Minho