ISEP – CIDEM – Comunicações em eventos científicos
Permanent URI for this collection
Browse
Browsing ISEP – CIDEM – Comunicações em eventos científicos by Author "Campilho, R.D.S.G."
Now showing 1 - 2 of 2
Results Per Page
Sort Options
- Development of a suitable project management approach for projects with parallel planning and executionPublication . Freitas, F.; Silva, Francisco J. G; Campilho, R.D.S.G.; Pimentel, C.; Godina, R.In a big company, project management (PM) is always present. Traditional predictive PM approach is concerned with planning everything in advance and then controlling and adjusting if necessary, throughout the project timeline. This may work well when the requirements are well established, but for maintenance projects brings inherent uncertainty. When the subject is aircraft maintenance, it is almost impossible to plan everything at the beginning and expect that it will occur as planned because however a scheduled maintenance plan exists, according to statistics 60% of the aircraft total failure can only be found with ground inspection which means, that even if a plan is established before receiving the aircraft, it will most certainly need to be significantly changed. This requires a big effort from the planning team to plan everything right and ensure that all tools and resources are available to perform the required tasks. To solve this issue, in this paper we propose a hybrid project management approach developed to a case study company from the aircraft repair sector, to enable a faster planning while taking into account the priorities and dependencies of the inherent project tasks with the available resources.
- Reducing scrap and improving an air conditioning pipe production linePublication . Lopes, R.; Silva, Francisco J. G; Godina, R.; Campilho, R.D.S.G.; Dieguez, T.; Pinto Ferreira, Luís; Baptista, Gabriel A GThe automotive industry is considered one of the most demanding and competitive sectors in the global market. This increasingly implies having a stable and optimized production process, always with a view to continuous improvement. Therefore, it is very important to be aware of all the waste that is generated in all production and logistics operations and take action to reduce them. In this regard and considering the process of producing air conditioning pipes for the automotive industry, a high scrap value was detected mainly due to soldering process. Therefore, the entire production process is analyzed in order to identify the main causes behind the high scrap value. Several Lean and quality tools are used to reduce not only the amount of scrap but also to increase the line productivity. In order to face this challenge, after elaborating the action plan and corresponding implementation, the scrap value is reduced by 12% in general, and productivity increased by 29%, 55% and 22.5% in three different references produced by the same machine. Although this solution is a bit expensive, the corresponding payback is reduced, so it can easily be applied transversally to other similar machines allowing extremely interesting gains in the short term.
