Utilize este identificador para referenciar este registo: http://hdl.handle.net/10400.22/4226
Título: A genetic algorithm for project scheduling with multi-modes and renewable resources
Autor: Magalhães-Mendes, J.
Data: 2010
Editora: ACM
Relatório da Série N.º: World Scientific and Engineering Academy and Society (WSEAS);
Resumo: This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.
Peer review: yes
URI: http://hdl.handle.net/10400.22/4226
ISBN: 978-960-474-252-3
Versão do Editor: http://dl.acm.org/citation.cfm?id=1965708
Aparece nas colecções:ISEP – CIDEM – Artigos

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
ART_JMagalhaesMendes_2010_CIDEM.pdf95,84 kBAdobe PDFVer/Abrir


FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpace
Formato BibTex MendeleyEndnote Degois 

Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.